Design Manager – Data Centre Construction -...
LJB & Co
Job ID: design-manager-data-centre-construction-ferrybridge-leeds-ukSalary: 85,000 - 95,000Company: LJB & CoLocation: Leeds UK UK
A high number of candidates may make applications for this position, so make sure to send your CV and application through as soon as possible.
Design Manager – Data Centre Construction
Location: Ferrybridge, Leeds, UKSalary: 85,000–95,000Sector: Data Centre / Mission-Critical ConstructionEmployment: Permanent
An opportunity is available for an experienced Design Manager to lead multidisciplinary design delivery on complex construction projects in London.
This role is suited to a design professional with an electrical engineering background and experience managing design teams across data centre, pharmaceutical, semiconductor or large-scale industrial projects.
Interested? xrnqpay Apply now with your CV, or get in touch with our team today to find out more about this opportunity.
A high number of candidates may make applications for this position, so make sure to send your CV and application through as soon as possible.
Design Manager – Data Centre Construction
Location: Ferrybridge, Leeds, UKSalary: 85,000–95,000Sector: Data Centre / Mission-Critical ConstructionEmployment: Permanent
An opportunity is available for an experienced Design Manager to lead multidisciplinary design delivery on complex construction projects in London.
This role is suited to a design professional with an electrical engineering background and experience managing design teams across data centre, pharmaceutical, semiconductor or large-scale industrial projects.
Interested? xrnqpay Apply now with your CV, or get in touch with our team today to find out more about this opportunity.
Reference: WJ-799_33892478